Content: 208_Рабочий проект технологии станции очистки подземной воды.rar (417.40 KB)
Uploaded: 04.12.2017

Positive responses: 0
Negative responses: 0

Sold: 17
Refunds: 0

$0.5
The project has developed a technological part of the system for cleaning groundwater and supplying drinking water to the consumers of a residential village.
The installation of preparation and supply of drinking water intended for the purification of iron-containing groundwater includes:
- aerator - degasser of ejection type;
- pressure mechanical filters for removing highly disperse impurities, causing turbidity and color of water, with a diameter of 920 mm. each;
- pumps that ensure the supply of water to the pressure filters and then to the tank of clean water;
- installation of UV-disinfection of water;
- pumps for the supply of purified water to the village network;
- a set of pipelines with fittings;
- flowmeters for monitoring the parameters of the water treatment plant and water consumption regimes.

The format is DWG, compatible with AutoCAD 2004-2017, Compass, ZWCAD, nanoCAD, BricsCAD, etc.
No feedback yet